• El Kilo 26 Cairo - Balbase Desert Road, Beside Co-Op Gas Station.

• Fabricate Grating for Greater Cairo Metro Line 3 Phase 4B (DEPOT).
Pmico installed about 800 m length in difference portions at main maintenance workshop of ADLY MANSOUR station