• El Kilo 26 Cairo - Balbase Desert Road, Beside Co-Op Gas Station.

PMICO has strong track record of projects with strong experience in Monorail Construction projects and Oil and Gas and subsea fields.

Customer Project Location Period System Scope Code Insurance company
ABB
Sub contactor
Caltex Tank
Farm
6th October
Cairo
2008 Construction of
New Tank Farm
• Procurement
• Installation
• Start up &
commissioning
ABB
Sub contactor
Fuchs “Lube oil plant” Burj El-Arab
Alexandria
2009 Water sprinkler • Installation
• Start up &
commissioning
NFPA 13 N/A
ABB
Sub contactor
Fuchs “Pump station” Burj El-Arab
Alexandria
2009 Fuel System and Pump station • Procurement
• Installation
• Start up &
commissioning
N/A
ABB
Sub contactor
Pirelli “Rubber Mixer 5” El-Amria
Alexandria
2010 “CMDA“ Water sprinkler • System design
• Installation
• Start up &
commissioning
FM FM Global
ABB Pirelli “Rubber Storage” El-Amria
Alexandria
2010 “ESFR” Water sprinkler • System design
• Installation
• Start up &
commissioning
FM FM Global
Sino Tharwa Drilling Company Main Yard Badr
Suez
2011 Fuel System • System design
• Installation
• Start up &
commissioning
N/A
Sino Tharwa Drilling Company Main warehouse Badr
Suez
2011 Fuel System • System design
• Installation
• Start up &
commissioning
N/A
Arabian Cement company Cable Tunnel Sokhna
Suez
2012 Water sprinkler • System design
• Installation
• Start up &
commissioning
NFPA 13 AIG
Arabian Cement company Alternative fuel Storage 1 Sokhna
Suez
2013 “ESFR” Water sprinkler • System design
• Installation
• Start up &
commissioning
NFPA 13 AIG
Titan Cement company Head quarter Cairo Egypt 2014 Standpipe system • Installation
• Start up &
commissioning
NFPA 13 N/A
Arabian Cement company Main line 1 Sokhna
Suez
2014 Water
Hydrant
• System design
• Installation
• Start up &
commissioning
NFPA 13 AIG
Oil & Gas Solutions Free Zone Company Fuel Station Yard Suez 2014 Fuel Tank
System
• System design
• Installation
• Start up &
commissioning
Arabian Cement company Alternative fuel Storage 2 Sokhna
Suez
2015 Deluge system • Installation
• Start up &
commissioning
AIG
Titan Cement
Egypt
Diesel tank farm and pumps BENI SUEF Cement 2015 Fuel Station “supply and erection of the diesel tank farm and pumps” • System design
• Installation
• Start up &
commissioning
Arabian Cement company Alternative fuel Equipment Building Sokhna
Suez
2015 Deluge system • Installation
• Start up &
commissioning
AIG
Titan Cement
Egypt
HFO system System for l and 2 calciner BENI SUEF Cement 2016 Heavy Fuel Oil System for l and 2 calciner • System design
• Installation
• Start up &
commissioning
Aquaterra energy Tension deck and CTU system Port said 2016 Manufacturing • Installation
• Start up &
commissioning
ED3209
Aquaterra energy Sub sea protective structure Suez
India
2017 Manufacturing sub sea protective structure for CAMERON” • Installation CM 3115
Aquaterra energy Riser joint pipes Obour & free zone Alexandria 2018 Repair & maintenance opreations • Repair
• Test
• paint
Aquaterra energy Centralisers Obour 2018 Manufacturing different sizes of centralisers • Installation
• Start up &
commissioning
Sarens Egypt Strand jack system Obour 2016 Manufacturing • Installation
• Start up
Sarens Egypt Cranes maintenance Obour
Alexandria
2017-
2018
Repair & maintenance operations • Repair
• Test
• paint
ABB Reefer rack & power transform shelter Obour & Dekhila port Alexandria 2016-
2017
Manufacturing
9 m high rack to supply power to containers
• System design
• Installation
• Start up &
commissioning
El SEWEDY PSP Lifting beam Obour 2018 Manufacturing
120 TON
lifting beam
• System design
• Installation
• Start up